Project

On The Move – BROEI

This project is a continuation of the modular designed & built structures during three residencies at Duivelsteen Ghent for BROEI between 2019 and 2022.
More info on the base of this project here

Our architectural interventions were carefully disassembled from the Duivelsteen castle, moved through Ghent, redesigned and reinstalled in the new space of BROEI at Nieuwland Ghent. New offices and storage spaces were built out of an on-site recuperable wooden mezzanine structure, a prototype for a concert-soundbox was made out of two shipping containers that were cut open with blood sweat and angle grinders.

No new wood was ordered.

Thanks to all the volunteers and people who passed by to help the proof of concept of the Connector to become a reality!

Related